Maintenance

2025-02-20

The Ten-Item Pre-Shift Excavator Inspection Checklist

The Ten-Item Pre-Shift Excavator Inspection Checklist - Jinyao Machinery news

Ten minutes of checks before work can catch 80% of potential failures early and cut downtime losses.

Most excavator failures give warning signs; a ten-minute pre-shift inspection catches the majority.

Ten items: engine oil and coolant levels; hydraulic oil and line leaks; track tension and wear; bucket teeth and pins; battery terminals; lights and warning gauges; seat belt and cab lock; slewing-bearing noise; smoothness of work motions; and site safety.

Stop and report any abnormality immediately. Our national service network offers on-site arrival within 48 hours.

Want more equipment information?

Call us for product brochures and customized quotes.

+86 16725498888